| Gulf of Mexico |
| NTL Number |
Effective Date |
Title |
| 2013-G02 |
March 19, 2013 |
Wells (holes-in-the-ground) Without Assigned BSEE API Numbers |
| 2013-G01 |
March 19, 2013 |
Global Positioning System (GPS) for Mobile Offshore Drilling Units (MODUs) |
| 2012-G-02 |
September 1, 2012 |
Damage Caused by Hurricane Isaac |
| 2012-JOINT-G02 |
January 1, 2012 |
Implementation of Seismic Survey Mitigation Measures and Protected Species Observer Program |
| 2012-JOINT-G01 |
January 1, 2012 |
Vessel Strike Avoidance and Injured/Dead Protected Species Reporting |
| 2012-BSEE-G01 |
January 1, 2012 |
Marine Trash and Debris Awareness and Elimination |
| 2011-JOINT-G01 |
December 29, 2011 |
Revisions to the List of OCS Lease Blocks Requiring Archaeological Resource Surveys and Reports |
| 2011-G01 |
June 1, 2011 |
Hurricane and Tropical Storm Effects Reports |
| 2010-G05 |
October 15, 2010 |
Decommissioning Guidance for Wells and Platforms |
| 2010-G02 |
March 3, 2010 |
Well Records Submittal |
| 2010-G01 |
February 1, 2010 |
Clarification of Deep Gas Royalty Relief Regulation |
| 2009-G40 |
January 27, 2010 |
Deepwater Benthic Communities |
| 2009-G39 |
January 27, 2010 |
Biologically-Sensitive Underwater Features and Areas |
| 2009-G36 |
January 1, 2010 |
Using Alternate Compliance in Safety Systems for Subsea Production Operations |
| 2009-G35 |
December 1, 2009 |
Sub-Seabed Disposal and Offshore Storage of Solid Wastes |
| 2009-G34 |
December 1, 2009 |
Ancillary Activities |
| 2009-G33 |
November 4, 2009 |
Well Naming and Numbering Standards |
| 2009-G32 |
November 4, 2009 |
In-Service Inspection Intervals for Fixed Platforms |
| 2009-G31 |
October 21, 2009 |
Hydrogen Sulfide |
| 2009-G30 |
September 1, 2009 |
Post-Hurricane Inspection and Reporting |
| 2009-G29 |
October 13, 2009 |
Implementation Plan for Transition from North American Datum 27 to North American Datum 83 |
| 2009-G28 |
October 13, 2009 |
Alternate Compliance and Departure Requests in Pipeline Applications |
| 2009-G27 |
September 9, 2009 |
Submitting Exploration Plans and Development Operations Coordination Documents |
| 2009-G26> |
September 9, 2009 |
U. S. Air Force Communication Towers |
| 2009-G25 |
August 25, 2009 |
Shutting In Producible Wells During Rig Moves |
| 2009-G24 |
August 14, 2009 |
Supervisory Control and Data Acquisition Systems |
| 2009-G23 |
August 14, 2009 |
Structure Assessment Before Moving a Platform Rig |
| 2009-G21 |
August 7, 2009 |
Standard Conditions of Approval for Well Activities |
| 2009-G20 |
August 6, 2009 |
Standard Reporting Period for the Well Activity Report |
| 2009-G19 |
August 5, 2009 |
Containment for Bolted or Welded Storage Tanks |
| 2009-G18 |
September 9, 2009 |
Production Safety Systems |
| 2009-G17 |
August 4, 2009 |
Designated Safe Welding Areas on Rigs |
| 2009-G15 |
July 10, 2009 |
Digital Pipeline Location Data |
| 2009-G14 |
May 21, 2009 |
Functional Responsibility of MMS Regulations |
| 2009-G13 |
May 20, 2009 |
Guidelines for Tie-downs on OCS Production Platforms for Upcoming Hurricane Seasons |
| 2009-G11 |
June 1, 2009 |
Accidental Disconnect of Marine Drilling Risers |
| 2009-G10 |
June 1, 2009 |
Guidelines for Jack-up Drilling Rig Fitness Requirements for Hurricane Season |
| 2009-G07 |
May 1, 2009 |
Location of Choke and Kill Lines on Blowout Preventer Stacks |
| 2009-G06 |
April 22, 2009 |
Military Warning and Water Test Areas |
| 2009-G05 |
April 27, 2009 |
Approval of Acidizing Operations |
| 2009-G04 |
January 27, 2009 |
Significant OCS Sediment Resources in the Gulf of Mexico |
| 2009-G03 |
January 27, 2009 |
Synthetic Mooring Systems |
| 2009-G02 |
January 27, 2009 |
Ocean Current Monitoring |
| 2009-G01 |
July 1, 2009 |
Casing Pressure |
| 2008-G22 |
November 19, 2008 |
Information Guidance for Availability of Well Data and Information Through the Gulf of Mexico Region Online Ordering System |
| 2008-G19 |
October 2, 2008 |
Changes to the Designation of Operator of an OCS Oil and Gas or Sulphur Lease |
| 2008-G17 |
September 16, 2008 |
Incident and Oil Spill Reports |
| 2008-G13 |
July 9, 2008 |
Electronically Stored Records |
| 2008-G09 |
June 1, 2008 |
Guidelines for Moored Drilling Rig Fitness Requirements for Hurricane Season |
| 2008-G07 |
June 15, 2008 |
Managed Pressure Drilling Projects |
| 2008-G06 |
May 26, 2008 |
Remotely Operated Vehicle Surveys in Deepwater |
| 2008-G05 |
May 1, 2008 |
Shallow Hazards Program |
| 2008-G04 |
May 1, 2008 |
Information Requirements for Exploration Plans and Development Operations Coordination Documents |
| 2008-G03 |
April 14, 2008 |
Pollution Inspection Intervals for Unmanned Facilities |
| 2007-G27 |
October 1, 2007 |
Assessment of Existing OCS Platforms and Related Structures for Hurricane Conditions |
| 2007-G26 |
December 15, 2007 |
Design of New OCS Platforms and Related Structures for Hurricane Conditions |
| 2007-G22 |
June 25, 2007 |
Suspensions of Operations for Subsalt and Ultradeep Geophysical Work |
| 2007-G21 |
June 1, 2007 |
Conservation Information Documents |
| 2007-G20 |
May 25, 2007 |
Coastal Zone Management Program Requirements for OCS Right-of-way Pipeline Applications |
| 2007-G15 |
May 14, 2007 |
eWell Permitting and Reporting System |
| 2007-G14 |
May 7, 2007 |
Pipeline Risers Subject to the Platform Verification Program |
| 2007-G12 |
April 4, 2007 |
Contact with District Offices and the Pipeline Section Outside Regular Work Hours |
| 2007-G09 |
April 3, 2007 |
Air Emissions Information for Applications for Accessory Platforms for Pipeline Rights-of-way |
| 2007-G08 |
April 2, 2007 |
Using a Motion Compensator when Conducting Coiled Tubing Operations on a Floating Production Platform |
| 2007-G05 |
March 1, 2007 |
Well Producibility Determinations |
| 2006-G20 |
October 25, 2006 |
Mudline Suspension Wells: Dry Tree Tiebacks and Conversion to Subsea Wells |
| 2006-G04 |
February 22, 2006 |
Fire Prevention and Control Systems |
| 2005-G07 |
July 1, 2005 |
Archaeological Resource Surveys and Reports |
| 2005-G01 |
January 6, 2005 |
Monitoring Bypassed Safety Devices |
| 2003-G20 |
January 1, 2004 |
Gas Volume Statement Requirements |
| 2003-G05 |
February 15, 2003 |
Procedures for Submission, Inspection and Selection of Geophysical Data and Information Collected Under a Permit and Processed or Reprocessed by a Permittee or a Third Party |
| 2003-G02 |
March 3, 2003 |
Ultimate Recovery Abandonment and Bypassing of Zones |
| 2001-G10 |
November 28, 2001 |
Clarification of Eastern Gulf of Mexico Sale 181 Military Areas Stipulation |
| 2000-G17 |
September 1, 2000 |
Suspension of Production/Operations Overview |
| 2000-G16 |
September 7, 2000 |
Guidelines for General Lease Surety Bonds |
| NTL 99-G19 |
September 7, 1999 |
Downhole Commingling Policies |
| NTL 99-G06 |
May 1, 1999 |
Economic Assumptions for RSVP Deepwater Royalty Relief Model |
| NTL 99-G05 |
April 26, 1999 |
Submittal of Documents for Platforms and Structures |