Document/Panel Number
NTL 2009-G34
Digital Object Identifier​
2009-12-01-G034-001
Body
Provides clarification on procedures for conducting ancillary activity, including at least 15 days' written notice to the regional office before initiating ancillary activity such as deploying air guns or seismic arrays in water depths of 200 meters or greater; creating bottom disturbances, independent of water depth, including ocean bottom cable surveys, and time lapse (4D) surveys; and geotechnical evaluation involving piston/gravity-coring or the recovery of sediment specimens by grab-sampling or other similar technique, and dredging of the seafloor.
Document Type
Document Collection
Issued Date
Division Responsible
Publication Date
NTL Status
Active
NTL Category
Plans and Information