Skip to main content

NTL 2007-G18 - Interim Guidelines for Tie-downs on OCS Production Platforms for the 2007 Hurricane Season - May 21, 2007

Document/Panel Number
NTL 2007-G18
Digital Object Identifier​
2007-05-21-G018-001
Body

This Notice to Lessees and Operators (NTL) is issued pursuant to 30 CFR 250.103 and provides guidance on the evaluation of tie-downs that you will use on your OCS production platforms to secure drilling and workover rigs and permanent equipment and facilities during the 2007 hurricane season. As required by 30 CFR 250.900(a), you must design, fabricate, install, use, maintain, and inspect all platforms and related structures on the OCS to ensure their structural integrity for the safe conduct of drilling, workover, and production operations, considering the specific environmental conditions at the platform location.

Document Type
Document Collection
Issued Date
Publication Date
NTL Status
Expired