Presentation of the 2015 Decommissioning Cost Estimates for POCSR Platforms

Body

BSEE develops decommissioning cost estimates every five (5) years for the purpose of assessing the ability of lessees to comply with the decommissioning requirements, and assist in decisions for supplemental bond requirements.

Objective of this study:

  • Provide cost update to the 2009 TAP report – Decommissioning Cost Update for Removing Pacific Outer Continental Shelf Region Oil and Gas Facilities, January 2010
  • Review, revise and update decommissioning scenarios, planning and engineering costs and methodologies assumed in the 2009 TAP report
  • Update costs of each phase of decommissioning process

This document is a PDF of a Microsoft Powerpoint Presentation

Attachment
Document
735ac.pdf (10.26 MB)
Issued Date
Publication Date
Date for required review