The purpose of the Joint Industry Project (JIP) is to provide BSEE with a solution to fully analyze well plan and casing design submitted by operators. It is BSEE’s oversight responsibility to ensure a well’s mechanical integrity by validating a design that provides accounts for all the anticipated loads that can be encountered during the life of the well. Therefore, the Contractor shall conduct a research project for the advancement of casing and tubing load analysis that previous tools were not capable. In particular, the focus will be on the multi-well thermal interference on offshore platforms and the impact of those temperatures on loads conditions.
N/A